The productive facilities are grouped in 3 sections:
Section 1: Machining shop, welding shop and pre-assembly hall. ext 4.000m2 (9 bridge crane units. from 8.000/32.000 Kg each)
Section 2: Assembly and machinery test. Ext. 2.200m2 (2 bridge crane units 16.000 Kg each)
Section 3: Sheet metal shop (folding, bending and welding) . Ext. 1.800m2 (5 bridge crane units from 5.000/16.000 Kg each)
.